Eliminating Bottlenecks: Speeding Up Your Ride

Across the subway system, the layout of our physical infrastructure creates bottlenecks that can lead to delays. This report details the work we’re doing to address some of the thorniest constraints in the system—and the planning underway to improve trips for all 4.5 million daily subway riders.

Some delays are not caused by anything broken or unusual, but by the design of the infrastructure itself. These bottlenecks include interlockings where multiple routes merge onto shared tracks, sharp curves, and complicated terminal turnarounds.

Improvements to two of our most critical bottlenecks are already advancing. Signal modernization on the Sixth Avenue Line will extend through the busy DeKalb interlocking used by B, D, N, Q, and R trains. The 2025–2029 Capital Plan also includes funding to untangle Nostrand Junction for 2345 service.

Transition tuning

Interactive map

All system bottlenecks

Explore the constraints shaping subway service

Hover over any location to learn about the operational problem, the proposed solution and the subway services affected. Continue scrolling to look more closely at two complex junctions.

B, D, N, Q and R trains

DeKalb Junction

DeKalb Interlocking

At DeKalb Interlocking in Downtown Brooklyn, the BD and NQ trains merge before re-splitting into two branches— one carrying the D and N and the other carrying the B and Q. For Brooklyn riders, this means that many stations provide direct service to both the 6 Avenue line, via the B or D, and the Broadway line, via the N or Q. However, the need for trains to merge at DeKalb Interlocking means that trains can be delayed waiting for another train to join the track ahead.

DeKalb Interlocking (Current Configuration)

Brookyn-bound N and D trains merge here on their way from the Manhattan Bridge. In this illustration, the D train has to stop and wait for the N to traverse the switch. Because of fixed block signaling, the following B train has to keep its distance as it approaches it’s switch to merge with the Q train. CBTC signaling will help with train spacing and timing so trains can move more smoothly through the interlocking.

DeKalb Interlocking (Current Configuration)

Manhattan-bound N and Q trains merge here on their way to the Manhattan Bridge. In this illustration, the Q train has to stop and wait for the N to traverse the switch. Because the B and Q trains share the track up to this point, the following B train also has to queue. Conflicts like this lead to cascading delays through the complex array of switches in this area.

DeKalb Solutions: CBTC + Switch Improvements

CBTC is coming to DeKalb Junction and the Manhattan Bridge tracks. The intent is to bring this forward by accelerating the 6th Av CBTC project. Switch layouts within the junction can also be improved to safely speed up trains and maximize benefits to riders.

Under Further Analysis: 36 Street to DeKalb Av

At the 36 Street station in Sunset Park, the D and N trains merge onto the shared express track under 4th Avenue before continuing north toward Manhattan. This shared track is busy during peak hours, and feeds directly into the DeKalb Avenue interlocking, meaning that any congestion can spread to the other lines that pass through DeKalb Avenue. On the express track D and N trains share between 36 Street and DeKalb Avenue, our legacy signal system keeps trains spaced farther apart than on many other lines. This makes these tracks prone to congestion, which causes D and N trains to reach DeKalb Avenue late, risking conflict with B or Q trains. Adjustments to the signal system on this section of track would allow trains to safely run more closely together, adding capacity and easing congestion even before full CBTC upgrades are made to this corridor. This would also improve service during disruptions and planned reroutes that require the D, N, and R trains to share the express tracks on the 4 Avenue line.

Under Further Analysis: Prospect Park

At Prospect Park, the B and Q lines reduce from four tracks down to two tracks, which connect the two routes to DeKalb Avenue. Congestion on these shared tracks can lead to greater congestion when trains arrive late to DeKalb Avenue. Adjustments to the signal system on this section of track would allow trains to safely run more closely together, adding capacity and easing congestion.

Under Further Analysis: Coney Island-Stillwell Avenue

The Coney Island-Stillwell Avenue terminal is the origin point for DFNQ trains. It is also adjacent to the Coney Island Yard—the largest such facility in the world, where BDFNQ and W trains are stored between trips. This makes Coney Island-Stillwell Avenue an extremely busy and complex area of the subway, and one where delays and congestion can affect several subway routes and thousands of riders. We are examining various alternatives to improve the layout of signals and switches in and around the Coney Island-Stillwell Avenue terminal. These improvements would increase the capacity of the terminal, reduce the number of conflicts with trains traveling to and from the yard, and improve the reliability of all the routes that pass through this area.

2, 3, 4 and 5 trains

Nostrand Junction

Nostrand Junction

Nostrand Junction is a busy interlocking where 2345 trains split into two branches. The service pattern through the junction—with 25 trains taking one branch and 34 trains the other—allows riders on a one-seat ride to either the East or West Side of Manhattan. However, branching at Nostrand Junction causes congestion that results in delays on all four lines and constrains the number of trains that can be operated on these lines. At peak hours, 2345 service is close to the limit of trains that can be scheduled through Nostrand Junction.

Nostrand Junction (Current Configuration)

Manhattan-bound 3 trains on the lower level of the Eastern Parkway line share this section of track with 2 and 5 trains coming from the Nostrand Avenue line. Watch the moving trains: the 5 train is routed through the junction first, forcing the approaching 3 and 4 trains to stop until it clears. Their red glow and warning icons mark time lost waiting for the conflicting movement. Conflicts like this create congestion and delays that affect all four lines.

Nostrand Junction (Current Configuration)

Brooklyn-bound local 2 and 3 trains share this section of track with express 5 trains. In this illustration, the 2 train has to stop and wait for the 5 to traverse the junction. The 5 train has to move slowly to maintain distance from the 3 train approaching President St-Medgar Evers College. Conflicts like this lead to congestion and delays that affect all of these lines for miles upstream.

Nostrand Junction (Untangled)

Adding a new interlocking on the Eastern Parkway line allows trains to switch tracks earlier and avoid conflicts. The new configuration also allows us to alter the service plan. 2 and 3 trains now take the Nostrand Avenue line to Flatbush Avenue-Brooklyn College and 4 and 5 trains take the Eastern Parkway line.

Under Further Analysis: Flatbush Avenue-Brooklyn College

At the southern end of the Nostrand Avenue line, Flatbush Avenue is the terminal for 2 and 5 service. Like Nostrand Junction, it has been identified as a bottleneck for decades. When the line was built over 100 years ago, Flatbush Avenue was not intended to be its permanent terminal, and it was designed with a layout that heavily constrains its capacity to handle frequent peak service on the 2 and 5 trains. Slow switches and speed limits approaching the end of the tracks cause congestion at this location. Since the Nostrand Avenue line directly feeds Nostrand Junction, delays at Flatbush Avenue or Nostrand Junction can exacerbate congestion. We are examining options to improve the speed of trains entering the station, which will improve the capacity of the Flatbush Avenue terminal and make it—and adjacent Nostrand Junction—less prone to congestion.

Under Further Analysis: 149 Street-Grand Concourse

149 Street-Grand Concourse is a key junction between the 2 and 5 trains in the South Bronx. The tracks near this station allow 5 trains to swap from sharing tracks with 4 trains in Manhattan to sharing tracks with 2 trains in the Bronx—but the tracks connecting these lines have sharp switches and curves that force us to slow trains down. These slow speeds mean that train congestion is common in this area. We are studying alternative options to raise train speeds through this area. This will ease congestion on 25 trains.

Interactive map

Explore the full system

Where else do constraints shape service?